PETRONAS’ Pipeline Interest 4

According to a media advisory issued on January 14, 2020, a legal complaint has been filed by the BC Civil Liberties Association. with the Civilian Review and Complaints Commission, against the RCMP Exclusion Zone established at the 27km mark on the Morrice Forest Service Road West in the Wet’suwet’en territories. This exclusion zone has been set up in the context of an escalation of the conflict around the passage Coastal Gas Link (CGL) pipeline . As I have noted before Malaysia’s PETRONAS’ investment in Kitimat is totally dependant on this CGL pipeline which will transport natural gas from PETRONAS’ own North Montney fields.

Harsha Walia, Executive Director of the BC Civil Liberties Association has said, “We are extremely concerned about the use of exclusion zones prohibiting Wet’suwet’en people, the public, and media from accessing Wet’suwet’en territories. The Wet’suwet’en assert continuous jurisdiction and unextinguished rights and land title, and the Charter protects liberty, mobility, freedom of the press, and the right not to be arbitrarily detained. This exclusion zone constitutes a serious violation of both the Indigenous rights and Charter-protected rights of Wet’suwet’en people and their family members,”

Further, the Union of BC Indian Chiefs Grand Chief Stewart Phillip, “We expect the provincial government and BC RCMP to honour the Supreme Court of Canada’s precedent-setting Delgamuukw/Gisday’way case and the United Nations Declaration on the Right of Indigenous Peoples in all their decisions and actions. For Wet’suwet’en people to be denied access to their own territories as a result of a police exclusion zone smacks of outright racism and the colonial-era pass system sanctioned by the so-called rule of law, which our people survived for far too long.”

Image: https://thetyee.ca/News/2019/12/20/RCMP-Planned-Snipers-Wetsuweten-Pipeline-Protest/

https://www.ubcic.bc.ca/media_advisory_legal_complaints_filed_against_rcmp_exclusion_zone?fbclid=IwAR2w6R-Zw7h658BYlhnrlMa1BT2xoX1qlR8yEDkl-GUdufzeeYuCR1bl_HM

PETRONAS’ Pipeline Interest 2

According to a post on the UNIST’OT’EN website Wet’suwet’en Hereditary Chiefs have submitted a formal request to the United Nations to monitor RCMP (police), government and Coastal GasLink (CGL) actions on their traditional, unceded territory. This request follows the directive from the UN Committee on Racial Discrimination (CERD) requiring Canada to halt the pipeline project and withdraw RCMP from our territory in order to avoid further violations of Wet’suwet’en, constitutional, and international law. This submission reveals the Chiefs’ perception of the imminent threat posed by the RCMP and security forces currently surrounding Wet’suwet’en villages and lands.

As I have noted before Malaysia’s PETRONAS crown corporation holds a 25% stake in LNG Canada’s Kitimat development which is totally dependant on this CGL pipeline. This pipeline is intended to transport natural gas from Dawson Creek to Kitimat and much of this gas will come from PETRONAS’ own North Montney fields. As noted in the Globe and Mail, the UN Committee for the Elimination of Racial Discrimination says that it is imperative that all affected First Nations give free, prior and informed consent before the pipeline proceeds. So once again, the interests of the exemplary Malaysian bumiputra (indigenous) led enterprise is contrary to the those of a group of indigenous people from British Columbia.

https://unistoten.camp/unintervention/

https://www.theglobeandmail.com/canada/british-columbia/article-wetsuweten-coastal-gaslink-pipeline-rcmp-explainer/

Fracking in BC

viewRoads and fracking drill pads slice up the scenery in northeastern BC (2013)

In June 2018, Centre forCPA-BC Resource Policy Analyst Ben Parfitt made a presentation to British Columbia’s Scientific Hydraulic Fracturing Review Panel in the context of rising provincial LNG industry and attendant concerns about general health and safety, and specifically the well being of Indigenous Peoples and communities.

Parfitt’s presentation included the following findings:

  • at least 92 dams were built in northeast BC without the companies that built them first obtaining the required licences and authorizations.
  • a large number of drilled and fracked gas wells in one remote operating area in northeast BC leaked methane gas, potentially contaminating groundwater.
  • increased water use at more fracking sites means more earthquakes.
  • contrary to the Province’s adoption and implementation of the United Nations Declaration on the Rights of Indigenous Peoples, the fracking operations in BC have taken place without the “free, prior and informed consent” of First Nations.

Imafe: https://thetyee.ca/News/2013/06/07/Northern-BC-Transition-Fuel/

https://www.policyalternatives.ca/publications/reports/ccpa-bc-presentation-scientific-hydraulic-fracturing-review-panel